Gypsum Board EIFS Details & Specifications

Gypsum Board EIFS Details & Specifications







Facades Commercial EIFS Plus

Guarding against water intrusion is the primary concern of any design professional. Beauty and style mean nothing if the function and integrity of the exterior cannot be maintained. That’s why, as a second layer of protection, our engineers came up with Facades WaterGuard™. The WaterGuard™ System is a fill-and-spray directly applied to the building substrate with reinforcing mesh at all joints and penetrations. WaterGuard™ creates a highly water-resistant envelope that helps protect the substrate during construction and in the case of an accidental penetration of the EIFS lamina. When used properly, WaterGuard™ can also be beneficial in preventing condensation within the wall cavity. Now that’s a PLUS!







1 gypsum board eifs details- cut through2 gypsum board eifs details- Grade lever- termination at concrete curb3-gypsum board eifs details- foundation termination above grade 14 gypsum board eifs details- rough opening and substrate preparation5 gypsum board eifs details- preperation of opening for storefront window6 gypsum board eifs details- preperation of opening for nail-on window7 gypsum board eifs details- termination at sill aluminum frame8 gypsum board eifs details- termination at jamb aluminum frame9 gypsum board eifs details- termination at head10 gypsum board eifs details- termination at head- solid substrate11 gypsum board eifs details- wall penetrations12 gypsum board eifs details- wood framing- expansion joint at floor line13 gypsum board eifs details- light gauge framing- expansion joint at floor line14 gypsum board eifs details- termination at parapet- cap flashing15 gypsum board eifs details- termination at parapet- solid substrate16 gypsum board eifs details- parapet adw wall termination17 gypsum board eifs details- soffit with drip18 gypsum board eifs details- soffit router- cut drip19 gypsum board eifs detailssoffit with expansion joint20 gypsum board eifs details- soffit- uninsulated21 gypsum board eifs details- outside corners22 gypsum board eifs details- outside corner- high impact23 gypsum board eifs details- structural expansion joint24 gypsum board eifs details- system expansion joint- dissimilar substrates25 gypsum board eifs details- structural expansion joint- inside corner26 gypsum board eifs detailsstructural expansion joint- outside corner27 gypsum board eifs details- penetations28 gypsum board eifs details- sign attachement29 gypsum board eifs details- system applied over metal lath substrate30 gypsum board eifs details- aesthetic reveals31 gypsum board eifs details- projecting graphics32 gypsum board eifs details- recessed graphics33 gypsum board eifs details -termination at deck- cross section34 gypsum board eifs details- termination at deck- cut away35 gypsum board eifs details- termination at sloped roof36 gypsum board eifs details- termination at roof stop flashinggypsum board eifs details- window detail for waterguard systemgypsum board eifs details- head and sill window detail for waterguard system

INTRO to Gypsum Board EIFS specifications

An air barrier Gypsum Board EIFS System minimizes the risk of condensation within the building envelope. It does this by eliminating mass transfer of warm moisture air into the wall assembly to a cold surface where it can condense. A complete air barrier Gypsum Board EIFS System has individual air barrier parts. Including the connections between them. The air barrier parts must be continuous. Then it is an effective air barrier Gypsum Board EIFS System. You must take material compatibility and construction sequencing into account. Only then can an air tight assembly ensure long term durability. Also Consider the effects of air tightness on mechanical ventilation.

This doc contains the specifications for this Gypsum Board EIFS System. These specifications follow a 3 part format.

TAILOR OUR specifications

These specifications cover all the ways of using the Gypsum Board EIFS System. Projects use combinations of these materials and methods. To tailor the specifications to your project use those sections which apply. Place certain parts of the specification in other parts of the project’s total specification. The project design pros are responsible for ensuring that the project specifications are suitable. This specification is to be used with Gypsum Board EIFS System detail drawings and product data sheets etc. For assistance in preparing your specification contact us.

UNITS

English Units are included in parentheses after the Standard International (SI) equivalents. The conversions represent commonly used equivalents.

WARNING

An air barrier should not be confused with a vapor retarder. A retarder may be used in the wall assembly to retard water vapor diffusion. Also to reduce the risk of condensation. A vapor retarder is placed on the warm side of the wall. It is placed on the interior side in cold climates. A vapor retarder may not be necessary. It depends on the wall components. Also the range of temps and humidity conditions. As well as the mechanical ventilation. A vapor retarder should not be used in warm humid climates.

DISCLAIMER

Info in this specification is to standard detail and product recommendations for the install of the Gypsum Board EIFS System. It is presented in good faith. We assume no liability to the architecture, engineering or workmanship. To insure that you are using the latest most complete info contact us.

PART I – GENERAL

1.01 SUMMARY

This doc contains all the our requirements for the proper design, use, and install. Use over vertical above grade concrete, masonry, and sheathing. It is intended to be used with typical details and application instructions. Project design parameters may require special details or specifications. The project design pro should prepare this.

A. SECTION INCLUDES.

1. Gypsum Board EIFS System.

B. RELATED SECTIONS.

1. Unit Masonry Section 042000.

2. Concrete Sections 03300 and 034000.

3. Light Gauge Cold Formed Steel Framing Section 054000.

4. Wood Framing Section 061000.

5. Sheathing Section 061600.

6. Water Barriers Section 072500.

7.Vapor Retarders Section 072600.

8. Membrane Roofing Section 075000.

9. Flashing and Sheet Metal Section 076000.

10. Joint Protection Section 079000.

11. Windows Section 085000.

12. Metal Support Gypsum Board EIFS Systems Section 09100.

13. Non load bearing wall framing Non load-bearing metal framing Gypsum Board EIFS Systems Section 09110.

14. Exterior Gypsum Board Substrates Section 09250

1.02. REFERENCES

A. ASTM B117. Federal Test Standard.

141A Method 6061. Test Method of Salt Spray Fog Testing.

B. ASTM C79 specification for Gypsum Sheathing Board.

C. ASTM C150 specification for Portland Cement.

D. ASTM C297 Test Method for Tensile Strength of Flat Sandwich Constructions in Flatwise Plane.

E. ASTM D968. Federal Test Standard 141A Method 6191. Test Method for Abrasion Resistance of Organic Coatings by Falling Abrasive.

F. ASTM E84 Test Method for Surface Burning Characteristics of Building Materials.

G. ASTM E108. Modified. Method for Fire Tests of Roof Coverings.

H. ASTM E330. Test Method for Structural Performance of Exterior Windows, Curtain Walls, and Doors by Uniform Static Air Pressure Difference.

I. ASTM G23. Federal Test Standard 141A Method 6151. Recommended Practice for Operating Exposure Apparatus. (Carbon-Arc Type) With and Without Water, for Exposure of Nonmetallic Materials.

J. ASTM C926-98a. Standard specification for Application of Portland Cement Based Plaster.

K. ASTM C1063-99. Standard specification for Install of Lathing and Furring to Receive Interior and Exterior Portland Cement Based Plaster.

L. ASTM C847-95. Standard specification for Metal Lath.

M. C933-96a. Standard specification for Welded Wire Lath.

N. ASTM C1032-96. Standard specification for Woven Wire Plaster Base.

O. Gypsum Board EIFS System Install Details.

P.Cleaning and Recoating.

Q. Expansion Joints and Sealants.

R.Water Vapor Transmission. (FS0111).

S. Gypsum Board EIFS System Application Instructions. (FS0514).

T. Mil Std E5272. Environmental Testing.

U. Mil Std 810B. Environmental Test Methods (mildew resistance)..

V. ULC S101. Standard Methods of Fire Endurance Tests of Building Construction Materials.

1.03 DEFINITIONS

A. Building Expansion Joint. A joint through the building structure. It is designed to accommodate structural movement.

B. Contractor. The contractor that installs this Gypsum Board EIFS System.

C. Expansion Joint. A discontinuity in the Gypsum Board EIFS System.

D. Facades. the manufacturer of the Gypsum Board EIFS System.

E. Finish. An acrylic based coating. It is applied to the outside surface of the base coat.

H. Sheathing. A substrate in sheet form.

I. Substrate. The material to which the Gypsum Board EIFS System is affixed.

J. Substrate Gypsum Board EIFS System. The total wall assembly including the attached substrate.

1.4 Gypsum Board EIFS System DESCRIPTION

A. The Commercial EIFS Plus is an EIFS Gypsum Board EIFS System. Class PB, with air barrier/ water proofing. It consists of a liquid air barrier (WaterGuard™ Gypsum Board EIFS System) adhesive, insulation board, base coat with reinforcing mesh(es) and finish. Mechanically attached Gypsum Board EIFS Systems shall conform to our specifications.

B. Method of Install. This Gypsum Board EIFS System is applied to the substrate.

  1. Design Requirements.

1. Acceptable Substrates for this Gypsum Board EIFS System are.

  1. Unglazed brick, cement plaster, concrete, or masonry.

b. Gypsum board meeting ASTM C1396.

c. Silicone treated gypsum sheathing surfaced with inorganic fiberglass mats meeting ASTM C1177.

d. Exterior fiber reinforced cement and calcium silicate boards meeting ASTM C1235.

e. APA Exterior or Exposure 1 rated Plywood Grade C D or better. 13 mm (1/2 in), minimum 4 ply.

f. APA Exposure 1 rated OSB. nominal 13 mm (1/2 in).

  1. Deflection of substrate Gypsum Board EIFS Systems shall not exceed L/240.
  2. The slope of inclined surfaces shall not be less than 6:12.
  3. The length of inclined surfaces (EPS shapes) shall not exceed 305 mm (12 in).
    1. Expansion Joints.
      1. Location of expansion joints is the responsibility of the project designer. It shall be noted on the project drawings. Expansion joints shall be placed at the following locations.

1) Where expansion joints are in the substrate.

2) Where building expansion joints are.

3) At floor lines.

4) Where this Gypsum Board EIFS System abuts dissimilar materials.

5) Where the substrate changes.

6) In continuous elevations at intervals less than 144 ft2 (13 m2) of surface area.

7) Where structural movement occurs. The max uncontrolled length or width is 5.5 lineal meters (18 lineal feet). Max uncontrolled length to ratio of 2 ½.

8) It is the responsibility of the project design team to determine expansion joint placement.

  1. Terminations.
    1. Shall be held back from adjoining materials a min of 19 mm (3/4 in) for sealant.

b. Terminated a min of 200 mm (8 in) above finished grade.

c. Sealants.

1) Supplied by others.

2) Compatible with the Gypsum Board EIFS System materials.

3) The sealant backer rod shall be of closed cell.

  1. Vapor Retarders. Use and location of vapor retarders is the responsibility of the project designer. It shall be noted on the project drawings and specifications.
  2. The use of dark colors must be considered in relation to wall surface temp. Use of dark colors in high temp climates can affect the performance of the Gypsum Board EIFS System.

D. Performance Requirements.

  1. This Gypsum Board EIFS System shall have been tested for durability as follows.

a. Abrasion Resistance. ASTM D968 (Federal Test Standard 141A Method 6191). no deleterious effects after 500 liters (132 gal).

  1. Accelerated Weathering. ASTM G23 (Federal Test Standard 141A Method 6151) 2000 hours. No deterioration.

c. Mildew Resistance. Mil Std 810B. passes.

d. Salt Spray Resistance. ASTM B117 (Federal Test Standard 141A Method 6061) 5%. Concentration for 300 hours. No deleterious effect.

  1. Fire performance.
    1. Flame Spread ASTM E84. When tested individually the adhesives and coatings shall have a Flame Spread index not exceeding 20. A Smoke Developed index not exceeding 10.

 

 

1.5 SUBMITTALS.

A. Product Data. The Contractor shall submit Manufacturer’s product data sheets describing products which will be used.

B. Samples. The Contractor shall submit two samples of this Gypsum Board EIFS System for each finish, texture and color to be used. The same tools and techniques for the actual install shall be used. Samples shall be of size to represent each color and texture.

  1. The applicator shall submit schedules and detail drawings. The drawings shall show details and other items as required. Then a proper evaluation can be made.

D. Test Reports. When requested the Contractor shall submit selected test reports. They must verify the performance of this Gypsum Board EIFS System.

1.6 QUALITY ASSURANCE.

A. Qualifications.

  1. Gypsum Board EIFS System Manufacturer. Shall be Facades. All materials shall be manufactured or sold by us. All shall be purchased from us or its distributor.
    1. Materials shall be manufactured at a facility covered by a current ISO. 9001:2000 certification. Certification of the facility shall be done by a registrar accredited by the American National Standards Institute. Registrar Accreditation Board (ANSI-RAB).
    2. Contractor. Shall be knowledgeable in the proper install of the Gypsum Board EIFS System. They shall be experienced in the install of Stucco Gypsum Board EIFS Systems. They shall possess a trained certificate from us.

B. Certifications.

  1. This Gypsum Board EIFS System shall be approved for use by building code authorities.
    1. Mock Up.
    2. The Contractor shall provide a mock up for approval.
    3. The mock up shall be the size required to represent the products being installed. Also include each color and texture to be used.
  2. Use the same equipment and techniques as the actual application. The finish used shall be from the same batch as that being used.
  3. The approved mock up shall be available at the job site.

1.7 STORAGE AND HANDLING

A. All materials shall be delivered to the job site in the original, unopened packages.

  1. Upon arrival. Materials shall be inspected for physical damage, freezing, or overheating. Questionable materials shall not be used.
  2. Materials shall be stored at the jobsite. Store in a cool, dry location, out of sunlight. Protected from weather and other damage. Min storage temp shall be 7°C (45 °F) for Coatings and Primers. 10 °C (50 °F) for other wet products. Minimize exposure of materials to temps over 32 °C (90 °F). Finishes exposed to temps over 43 °C (110 °F) for even short periods may exhibit skinning. Increased viscosity and should be inspected prior to use.

1.8 PROJECT CONDITIONS.

A. Environmental Requirements.

1. Application shall not take place during inclement weather. Protect materials from inclement weather.

2. Application of wet materials shall be at a min temp of 4 °C (40 °F), 7 °C(45 °F) or 10 °C (50 °F) depending on product and rising. Maintain for a min of 24 hours or until completely dry.

B. Existing Conditions.

  1. The Contractor shall have access to power and water. The are shall be clean.

1.9 SEQUENCING AND SCHEDULING

  1. Install of this Gypsum Board EIFS System shall be coordinated with other trades.
  2. Sufficient manpower and equipment shall be used for continuous operation.

1.10 LIMITED MATERIALS WARRANTY

A. We shall provide a limited warranty against defective material upon written request. We make no other warranties. We don’t warrant workmanship. Full details are available.

1.11 SIGN RESPONSIBILITY.

A. It is the responsibility of both the specifier and the purchaser to determine if a product is suitable for their intended use. The designer shall be responsible for design, detail, structural capability, attachment details, shop drawings and the like. We have prepared guidelines in the form of specifications, application details and product data sheets to help the design process only. We are not liable for any errors in design, detail, structural capability, attachment details, shop drawings, or the like. Whether based upon the info prepared by us or otherwise. As well as changes which may have been made to our published comments.

1.12 MAINTENANCE

  1. Maintenance and repair shall follow procedures noted in this Gypsum Board EIFS System Application Instructions. (FS0514)

B. All products are designed to minimize maintenance. Some cleaning may be required.

  1. Sealants and flashings should be inspected regularly. Make repairs as necessary

PART II -PRODUCTS

2.1 MANUFACTURING

A. All components shall be obtained from us or our distributors.

2.2 MATERIALS

A. Portland Cement: Shall be Type I, I-II or II, meeting ASTM C150, white or gray in color, fresh and free of lumps.

B. Water: Shall be clean and free of foreign matter.

C. Mechanical Fasteners: Shall be Wind-Lock’s Wind Devil™ plates, or equivalent, used in conjunction with corrosion resistant fasteners appropriate for the substrate Gypsum Board EIFS System.

2.3 COMPONENTS

A. WaterGuard:

1. Joint Treatment: WaterStop Fill-Ready mixed acrylic based flexible joint treatment for rough opening protection and joint treatment of wall sheathing.

2. Water-Resistant Coating: WaterStop Coat- ready mixed acrylic based water-resistant coating for wall sheathing.

A. Adhesives. Used to adhere the EPS architectural shapes to the Base Coat.

  1. Cementitious. A liquid polymer based material which is field mixed with Portland cement. Used over non wood based substrates.
    1. Shall be Base Coat.
    2. Ready mixed. A dry blend cementitious, copolymer based product. It is field mixed with water. Its used over non wood based substrates.
      1. Dry Mix Base Coat.

B. Insulation Board. Expanded polystyrene meeting our specifications for Insulation Board. supplied by an EPS board supplier licensed by us.

B. Architectural Shapes. Expanded polystyrene meeting Facades Specification. Supplied by an EPS board supplier licensed by us.

  1. Base Coat. Shall be compatible with the EPS architectural shapes and reinforcing mesh.
  2. Cementitious. A liquid polymer based material. It is field mixed with Portland cement.
    1. Wet Base Coat.
    2. Non cementitious. A factory mixed fully formulated water based product.
      1. Synthetic Base Coat.
      2. Ready mixed. A dry blend cementitious copolymer based product field mixed with water.
        1. Dry Mix Base Coat.

D. Reinforced Meshes. Shall be a balanced open weave glass fiber fabric. It shall be treated for compatibility with other Gypsum Board EIFS System materials. It shall be available in the following weights. It shall provide the indicated min tensile strengths:

1. RM100: 152 g/m2.

(4.5 oz/yd2); 27 g/cm

(150 lbs/in).

2. RM100x: 203 g/m2.

(6 oz/yd2); 36 g/cm

(200 lbs/in).

3. RM310:407 g/m2.

(12 oz/yd2); 54 g/cm

(300 lbs/in).

4. RM109: 146 g/m2 (4.3 oz/yd2);

27 g/cm

(150 lbs/in).

E. Admix. A modified acrylic binder.

F. Finishes. Shall be the type, color and texture as selected by the architect. It shall be one or more of the following.

  1. Acrylic finish. (water-based, acrylic coatings with integral color and texture).

A Quartz Tex is a great Swirl texture.

b. Fine QuartzTe is a great Fine swirl texture.

c. Free Stylus is a Fine or varied texture.

d. Pebble Float is a Pebble texture.

E Sand Float is a Sand texture.

Elastomeric Finish. water based acrylic coating.

A Quartz Tex is a Swirl texture.

b. Fine Quartz Tex is a Fine swirl texture.

c. Free stylus is a Fine or varied texture.

d. Pebble Float is a Pebble texture.

E Sand Float E is a Sand texture.

  1. elastomeric coating.
  2. BellaCoat™ T: Textured elastomeric coating.
    1. Primers and Sealers.
    2. Primer: A water based acrylic primer.
    3. Sealer: Clear acrylic sealer.

2.4 ACCESSORIES

A. Secondary Moisture Protection Barrier. A secondary weather barrier must be installed over sheathed substrates. It must be wrapped into rough openings prior to install.

1. Acceptable Secondary Moisture Protection Barriers include. Tyvek® StuccoWrap™ and equals that comply with local building codes. Other code approved asphalt saturated papers are also acceptable. Trowel or roller applied weather barriers can be used if a layer of polymeric weather resistive barrier is applied over it.

  1. Install the Secondary Moisture Protection Barrier over the substrate. Install it according to specifications and code requirements.
  2. The Secondary Moisture Protection Barrier shall be free of any damage. It must be applied to all surfaces.
  3. Wrap the Secondary Moisture Protection Barrier into rough openings. Do this to increase the level of moisture protection to the building frame and interior.
  4. Coordinate work with other trades.

PART III – EXECUTION

3.1 EXAMINATION

A. Prior to install of this Gypsum Board EIFS System ensure that the substrate.

  1. Is of a type listed in Section 1.04.C.1.
    1. Is flat within 6.4 mm (1/4 in) in 1.2 m (4 ft) radius.
  2. Is sound, dry. Connections are tight. Has no conditions that may interfere with this Gypsum Board EIFS System install.

B. The contractor shall notify the GC of all discrepancies.

  1. Prior to the install of this Gypsum Board EIFS System. All needed waterproofing details shall have been completed.

3.2 SURFACE PREPARATION

A. The substrate shall be free of foreign materials.

3.3 INSTALL

A. EIFS Plus Gypsum Board EIFS System shall be installed in accordance with the application instructions.

B. The overall min base coat thickness shall be sufficient to fully embed the mesh. The recommended method is to apply the base coat in two (2) passes.

C. Commercial EIFS Plus base coat surfaces in contact with sealant shall be coated with our Primer. Sealant shall not be applied directly to textured finishes or base coat surfaces.

D. When install of Commercial EIFS Plus under ICC National Building Code jurisdiction. The notched trowel method of adhesive application shall be used over gypsum board.


3.4 FIELD QUALITY CONTROL

A. The Contractor is responsible for the proper application.

B. We assume no responsibility for application of products.

  1. If required, the Contractor shall certify in writing the quality of work performed. It will be relative to the substrate Gypsum Board EIFS System, details, install procedures, workmanship and products used.

D. If required, the EPS supplier shall certify in writing that the EPS meets our specifications.

E. If required, the sealant Contractor shall certify in writing that the sealant application is in accordance with the sealant manufacturer’s recommendations.

3.5 CLEANING

A. All excess materials shall be removed from the job site. It will be done in accordance with applicable law.

B. All areas where this Gypsum Board EIFS System has been installed shall be left free of debris.

3.6 PROTECTION

A. This Gypsum Board EIFS System shall be protected from damage.

This is the end of the specification section of this page.

So if plastering is your thing then this Gypsum Board EIFS System is a great choice. of course you should look at all of our Gypsum Board EIFS Systems before you make that choice of which on you will be plastering with. We sell all of the products that you will need for this plaster Gypsum Board EIFS System. From mesh to base coat to finish we have it. If you have any questions then fell free to give us a call anytime. We are here to help you!