Description
Installation for Cornices for EIFS and stucco
1. Apply Base Coat to the back of the moulding in a vertical pattern, using 3/8″
notched trowel.
2. Press the moulding into place. use temporary mechanical fastener if needed.
3. Remove excess adhesive (if any) along the moulding before curing.
4. Allow 24 hours to cure.
5. Add 4″ fiberglass mesh bridging the seam between the trim and the wall, 1/2 on the trim 1/2 on the wall.
6. allow 24 hours to cure.
7. Float finish on top.